233 Miller Road Rochester, PA 15074 | 724-774-7822 | info@newsewickley.com
Road
Home / Departments / Road

The Road Department is comprised of five full-time employees responsible for over 50 miles of Township roads.  Their duties include, but are not limited to, road construction and maintenance, winter snow and ice removal, erection of traffic and street signs, storm sewer work and maintenance and repair of equipment.

Winter Maintenance Manual: NEW SEWICKLEY TWP SNOW and ICE CONTROL PLAN 2021-2022

NamePosition
R. J. KrausRoad Foreman
Bill BurrEquipment Operator
Paul MoehrleEquipment Operator
Calvin StefflerDriver Laborer
Bradley MutschlerDriver/Laborer
Road Department

Powell Road Slope Stabilization and Stormwater Improvements

The Township completed a Stormwater related project on Powell Road this summer (2021) with the help of a grant through the Beaver County Conservation District and the Commonwealth of Pennsylvania. The New Sewickley Township Road Department installed a retaining wall and added multiple catch basins, new pipe, and created stabilization around outfalls to stop an ongoing slide that was threatening the long-term use of the road. Thank you to our partners at the state of Pennsylvania for helping us attain funding for this project, especially State Senator Elder Vogel and State Representative Jim Marshall.

BEFORE & DURING CONSTRUCTION

   

   

AFTER CONSTRUCTION

              

 

Visits: 6951